Rommtech added a new oven behind the coasting machine.
With this oven it's possible to reduce the drying time of the coated pcb's
![](/Portals/0/news/Lakoven/20171123_083121.jpg)
![](/Portals/0/news/Lakoven/Lakoven aangesloten.jpg)
Now we can coat double-sided without a long drying time. An enormous acceleration in the lead time. Read all about the process improvements in Smans' blog here.